-
-
Material Management System
BMCS: Bill of Materials (BOM) Validation System
BMCS provides integrated support for BOM data entry, validation, quantity aggregation, and summary report generation.
Contact Us
Prevent Quantity Risks with Accurate BOM Data Management Manage BOM data systematically to prevent quantity risks.
-
BOM Data Entry and Management
Manual BOM tracking creates data inconsistencies—enter and manage BOM data with standardized features to register and maintain project BOM information per established standards.
-
BOM Data Lookup and Review
Scattered BOM data slows down verification—look up and review BOM data in a centralized system to view registered BOM information on screen.
-
BOM Data Summaries and Statistics
Manual quantity aggregation is error-prone—view summaries of quantity and weight information based on BOM data to manage BOM data status in report format.
Why Choose BMCS
-
Integration of BOM with 3D Model Data
• Import 3D model data for use in BOM management
• Use design model data directly for BOM control -
Manual Entry and Management of BOM Data
• Enter and manage BOM data based on project requirements
• Maintain consistent BOM information across the project -
Project-Based Material Allowance Management
• Define and manage material allowance per project
• Improve control over material quantity planning -
BOM Reporting and Data Visibility
• Generate summary and weight reports from BOM data
• Monitor project quantities through structured reporting
-
FAQ
-
- BMCS는 어떤 데이터를 관리하나요?
- BOM 데이터의 입력, 검증, 물량 집계 및 요약 보고서를 관리합니다.
- 3D 모델 데이터와 연계할 수 있나요?
- 3D 모델에서 생성된 데이터를 BOM 데이터로 연계해 활용할 수 있습니다.
- 산출물은 어떤 형태로 제공되나요?
- 수량 및 중량 기준의 요약 보고서와 프로젝트 물량 보고서를 출력할 수 있습니다.
-
Related Products
-



